Dentrix to Denticon conversion: what is the checklist, the timeline, and what breaks?

Last reviewed November 23, 2026 by Craig Iott, Founder, All Solutions Consulting. 8 minute read.

What goes on the checklist before each office goes live?

Here is the list we run before every office at the six-location group we are converting from Dentrix to Denticon, office by office. Each item has an owner and a date on the shared board, and nothing goes live until every row is checked.

Checklist itemWhenWho owns itHow you know it is done
Carrier mapping: every insurance plan in Dentrix mapped to a plan in DenticonWeeks before extraction, with a hard deadline on the boardYour RCM lead, with the vendorEvery active plan has a match, and the unmatched list is empty
Data audit: a sample of charts, ledgers and images checked against the sourceBefore extractionYour operations lead and our operatorThe audit log shows what was checked and what was fixed
Archive decision: which old records convert and which are archivedBefore extractionThe owner or COO signs itA written list of what stays behind, so nobody looks for it in the new system
Imaging plan: which scans transfer, which need a manual upload, where new scans will liveBefore extractionOffice manager and the imaging vendorThe upload steps are written and someone has done them once
Forms rebuilt and checked in the new systemBefore trainingOffice managerEvery form tested with a real patient record, not just the first one
Clearinghouse set up with every provider configuredBefore go-liveYour RCM leadA test claim for each provider leaves the clearinghouse
Fee schedules and NPI structure confirmed with each payerBefore go-liveYour RCM lead and credentialingEach provider is attached to the right fee schedule in writing
Training on the office's own converted dataThe two days before go-liveThe vendor trainer with the office team; our operator keeps the issues listEach person has worked a real schedule, a real ledger and a real claim
Go-live support plan: who is in the office, who is on call, how to reach the vendorThe week beforeYour operations leadNames and phone numbers on the board, not in someone's head

Two of those rows exist because of what went wrong at earlier offices. The clearinghouse row is there because a check at one office found claims that had never left it. The forms row says "not just the first one" because a fix applied to one form did not reach the others, and the office manager corrected the rest by hand.

What does go-live week look like?

The shape we settled on, after the first offices taught us what two extra days are worth:

DayWhat happensWho is in it
Wednesday nightData is extracted from Dentrix and loaded into DenticonVendor, with your RCM lead confirming the extract ran
ThursdayTraining on the office's own converted data; the conversion review startsThe office team and the vendor trainer; our operator keeps the issues list
FridayTraining continues; the review finds the problems and the fixes go in before patients are in the chairSame group, plus the vendor's support contact
MondayGo-live, with the office open and someone in the room who knows the planThe office team and your operations lead, with our operator on the issues list all day
The rest of week oneA daily check of three things: can the front desk edit insurance plans, do new images land where they should, are claims leaving the clearinghouseOffice manager and RCM lead, reported on the board each day

The two training days are not padding. They are the time in which the review of converted data turns up the things that would otherwise turn up with a patient at the desk on Monday morning.

What breaks first, and what do you do about it?

Three things, at the offices we have converted so far.

  1. Insurance plans. After one office went live, the converted plans could not be edited or deleted. The front desk estimated coverage by hand, and some treatment and cost conversations were deferred until the vendor fixed it. The fix: put the carrier mapping deadline weeks ahead of extraction. Then, on Thursday of go-live week, have the front desk try to edit real plans before anyone sees a patient.
  2. Imaging. Converted CBCT scans were available in the new system, but new scans did not transfer on their own and needed a multi-step manual upload. The fix: decide before extraction where new scans will live, write the upload steps, and have one person do it once during training.
  3. Claims. Claims get stuck between the practice management system and the clearinghouse when they are not mapped correctly or the team cannot tell which ones went out. At one office, 79 claims had not been submitted because only one provider had been configured in the clearinghouse. The fix: a test claim per provider before go-live, and a daily count of claims that left the building during week one.

What we got wrong the first time: at one office the conversion work ran late, and the insurance failure showed up when patients were already at the desk. We changed two things for the next office. The extraction moved to Wednesday night, which gave us two full training days before go-live. The review of converted data became a scheduled step with an owner, instead of something the team discovered on Monday.

How long does the whole conversion take for a multi-location group?

Months, and the calendar is set by your team's capacity for carrier mapping and data audits, not by the vendor's availability. At the six-location group, three offices were live by mid-November 2026 and the fourth was scheduled. Its carrier mapping and data audit deadlines were on the board ahead of the go-live date.

The group has also kept two-office same-day conversions on the schedule, with one condition. Both offices have to be staffed for go-live week, and the vendor has to be able to support both. If either office is short a manager that week, we stagger them.

Scope is held the way we hold it on every engagement. One initiative at a time, the success measures written before the work starts, a change order for anything outside the scope. A conversion is the engagement most likely to grow a second and third initiative inside it: a fee schedule clean-up, a group credentialing project, a new imaging workflow. Each of those gets its own board. None of them quietly extends the conversion.

What should you check once the offices are live?

Judge it the way we judge any system rollout: 60 to 90 days after setup, against the lines you wrote before you started.

For a conversion, the post-implementation review covers four things. Whether the office processes are being followed in the new system, or whether people have built workarounds. Whether the training held, and who needs a second round. Whether staff turnover since go-live left gaps in who knows the system. And whether claims are moving. At the group we work with, the plan is to audit system performance across the three live offices once enough data has accumulated to show where claims get stuck.

The review also sets up the next project. Different fee schedules across offices produce different patient estimates when a patient visits a second location. An NPI ordering error in an earlier contracting round had put providers on the wrong fee schedules, and it took months of claim reprocessing to undo. The group is now combining its six locations under one entity and recredentialing its providers together in 2027. That is a separate project with its own scope, and it is easier to run on clean converted data than on six different databases.

Who does the work, and how do you know it got done?

Two people from our side: a senior on the plan and the relationship, and an operator inside your boards every day, on the issues list all day during go-live week.

Every checklist item above sits on a shared board with an owner and a due date, reviewed weekly with your operations lead. When a row says done, the evidence is attached: the unmatched carrier list, the audit log, the test claim confirmation. That is the same way we run every engagement, and it is the reason a conversion does not depend on remembering who promised what.

What do you do this week?

If a conversion is ahead of you, three things before you talk to anyone.

  1. Count your active insurance plans per office. That number sets the carrier mapping timeline, and it is usually larger than the office manager guesses.
  2. Ask the vendor two questions in writing: can converted insurance plans be edited on day one, and which image types transfer automatically. Keep the answers.
  3. Name the person on your payroll who will own go-live week at each office. If the answer is a pause, that is the first thing to solve.

Then book the 30-minute call. You walk us through your offices, your current system and your dates. We tell you which rows of the checklist you already have, which are missing, and what the first 30 days would look like with us in the plan. If you do not need us for it, we say so on the call.

Frequently asked questions

How long does a Dentrix to Denticon conversion take for a multi-location group?

Plan on one office, or one pair of offices, at a time, with carrier mapping and a data audit finished before each go-live. At the six-location group we are converting, three offices were live by mid-November 2026 with the fourth scheduled. The whole group takes months, and the calendar is set by how fast your team can map carriers and audit data, not by the vendor.

Should two offices convert on the same day?

Only if you can staff both for go-live week and the vendor can support both. The group we work with kept two-office same-day conversions on the schedule with that condition attached. If either office is short a manager that week, stagger them.

What breaks first after go-live?

Insurance plans, imaging and claims, in that order. At one office the converted insurance plans could not be edited or deleted, so the front desk estimated coverage by hand until the vendor fixed it. New CBCT scans needed a manual upload. And 79 claims at one office sat in the clearinghouse because only one provider had been configured in it.

Do you need to be on site for a go-live?

Go-live week needs eyes in the room, and that is your operations lead or office manager. Our operator works the issues list with them all day. Carrier mapping, data audits, training and the first-week checks live in the system and run remotely.

What happens on the 30-minute call?

You walk us through your offices, your current system and your go-live dates if you have them. We tell you which items on this checklist you already have, which ones are missing, and what the first 30 days would look like with us in the plan. No pitch deck.

Where the proof on this page comes from

Every number and named process above traces to a row in our proof library. Each row names its source and the date we last checked it.

  1. P-023 A six-location dental group converting from Dentrix to Denticon office by office: three offices live, the next go-live scheduled, two-office same-day conversions, carrier mapping and a data audit before each one. ASC engagement, client not named. Verified 2026-11-16.
  2. P-025 Go-live week shape: data extracted Wednesday night, Thursday and Friday for training on the converted data and the conversion review, Monday go-live. ASC engagement, client not named. Verified 2026-11-16.
  3. P-024 Conversion lesson: after one office went live, insurance plans could not be edited or deleted, so the front desk estimated coverage by hand until the vendor fixed it. New CBCT scans did not transfer and needed a manual upload. ASC engagement, client not named. Verified 2026-11-16.
  4. P-047 At one converted office of a six-location group, a post-conversion check found 79 claims that had never left the clearinghouse because only one provider had been configured in it. ASC engagement, client not named. Verified 2026-11-23.
  5. P-048 Conversion lesson: claims get stuck between the practice management system and the clearinghouse when they are not mapped correctly or the team cannot identify them, and an NPI ordering error in an earlier contracting round put providers on the wrong fee schedules and caused months of claim reprocessing. The group is combining its six locations under one entity and recredentialing its providers together in 2027. ASC engagement, client not named. Verified 2026-11-23.
  6. P-043 Pilot rule Craig gives on calls: set success and failure criteria before the pilot starts, judge it 60 to 90 days after setup, and a lift under 15 percent may not justify the cost. Craig, discovery call. Verified 2026-11-16.
  7. P-046 Scope control on every engagement: one initiative at a time, KPIs defined before the work starts, change orders for anything outside scope, an internal hand-off with the proof pack at the end. ASC DSO Solutions offer. Verified 2026-11-16.
  8. P-005 Two people on every client: one senior on strategy and the relationship, one operator inside your boards every day. ASC offer structure. Verified 2026-11-16.
  9. P-012 Client work runs on a shared board with owners and due dates (the Command Board), reviewed weekly. ASC Customer Success offer; client boards. Verified 2026-11-16.
  10. P-041 The 30-minute call: no pitch deck; by the end of it you know whether ASC is the right fit and what we would do first. ASC. Verified 2026-11-16.
The next step is a 30-minute call

Book a 30-minute call

Thirty minutes, no pitch deck. You tell us how your locations run today and what is not working. We tell you whether we are the right people to fix it, what we would do first, and which of the two engagement shapes fits. If we are not the right fit, we say so on the call.