What are the two shapes, side by side?
Every discovery call ends up here, usually from the owner: do we buy this once, or do we keep you? Here is how I lay it out on the call, with no dollar figures, because the number depends on what we find in your locations.
| Build and hand off | Build and stay | |
|---|---|---|
| Length | 90 days, fixed scope | 90-day build, then month to month |
| Who is in your boards | Two people from ASC: a senior on strategy and the relationship, an operator inside the boards daily | The same two people, before and after day 90 |
| What exists at day 90 | The boards, the scorecard, the weekly meeting, the written playbook for the initiative, and your team running all of it | The same, with the operator still running the cadence |
| Day 91 | Your operations lead owns the scorecard and the weekly meeting | The ASC operator keeps owning them; your lead attends and decides |
| Fits when | One initiative with a clear end, and someone on your payroll who will own it | An initiative list for the year, or no one on payroll to own the scorecard yet |
| How the price is shaped | One quote for the scope, before day 1 | A monthly figure, sized to the hours the boards need |
| How it ends | A hand-off on a checklist, with the proof pack | Whenever the scorecard says your team owns it, or whenever you say so |
What do you get in the first 90 days in either shape?
The first 90 days are identical, which is why the choice does not have to be made on day 1. Four phases, one board, a named deliverable at day 30, 60 and 90.
| Days | What happens | What you hold at the end of it |
|---|---|---|
| 1 to 14 | We are in every office: how the work runs today, who owns what, where the drift is | A written diagnosis and the initiative we start with |
| 15 to 30 | The board, the scorecard and the weekly meeting go live; any system we are rolling out is technically set up inside this window | The day 30 deliverable: a running cadence with evidence on every task |
| 31 to 60 | The initiative runs office by office; the operator is in the boards daily; the senior reviews the scorecard with you weekly | The day 60 deliverable: the first two months of numbers against the plan |
| 61 to 90 | Adoption is measured against the lines we wrote on day 1; the playbook is written as it proves out | The day 90 deliverable: the playbook, the proof pack, and the hand-off or the decision to stay |
Scope is held the same way in both shapes: one initiative at a time, the success measures written before the work starts, and a change order for anything outside the scope. Scope control is a deliverable, and it is the one that keeps a 90-day build from becoming a nine-month one.
When is build and hand off the right call?
Three conditions, and you need all three.
- The initiative has an end. A practice management software conversion, a new location opening, a financing platform going live across the group. The work has a go-live date, and after it the job is running the thing, which your team can do.
- Someone on your payroll will own day 91. A director of operations, a regional manager, an office manager you are growing into a regional role. Without that person, the boards go quiet in month four and the build was a report with extra steps.
- You want the playbook to be yours. The hand-off is internal: the proof pack, the boards and the scorecard your team has been running since day 30, so the next conversion or the next office runs on the same cadence without us.
That six-location conversion is a build and hand off at its cleanest: each office has a go-live, each go-live has a carrier mapping, a data audit and a review before it, and the group's own team runs each one alongside us. We bring the method and the evidence discipline; the group keeps the playbook.
When is build and stay the right call?
Also three conditions, and one is enough.
- You have an initiative list, and it is longer than one. Next year's list at the groups I talk to is rarely a single item: a clear aligner program, a financing platform, a revenue cycle rebuild, a phone system, an acquisition. Each needs the same cadence, and standing the cadence up and taking it down for each one costs more than keeping it running.
- Nobody on payroll owns the scorecard yet. You are recruiting an operations lead, or your best office manager is not ready for the regional role. The operator holds the seat until your person is in it, then hands it over inside the engagement.
- The group is in a growth event. An acquisition, a second location for a founder-run practice, a PE process. The weekly cadence is what keeps the existing offices steady while the new thing lands.
At the four-office group where we run the leadership meeting and the office managers meeting, the list this year included a revenue cycle rebuild, an AI phone agent across the offices and a manager search that ran for months. That is a build and stay. The weekly meeting is the thing that does not stop while the list gets worked.
What does each cost, and why is the number not on this page?
The number is not on this page because the honest answer is a range wide enough to be useless until we have seen your locations. What I can tell you is what moves it.
| What drives the quote | Moves it up | Moves it down |
|---|---|---|
| Number of locations in scope | Each office adds check-ins, a scorecard row and go-live work | A pilot in one or two offices first |
| Number of initiatives | Every initiative is its own board and its own success lines | One initiative at a time, which is also how we hold scope |
| Who on your side owns what | Nobody to own day 91 means the operator carries more | A director of operations who attends the weekly meeting and takes the hand-off |
| On-site time | Go-lives and diagnoses that need eyes in the room | Verification that lives in the system, which is most of it |
| Shape | Month to month carries a standing operator | A fixed-scope build quoted once |
For a PE-backed group looking at add-backs, a build with a defined scope and named deliverables can be structured as a capital expense. Ask on the call and bring your timeline.
The quote comes after the call, in writing, with the deliverables for days 30, 60 and 90 written next to it. If you forward this page to a partner or a board, that is the document they will want to see next, and it is the one we are both working toward.
How do you decide, this week?
Answer three questions and the shape is usually obvious.
- Name the person on your payroll who will own the scorecard on day 91. If the answer is a pause, it is build and stay until that person exists.
- Count the initiatives you need to land in the next twelve months. One with a clear end is a build. Three or more is a stay.
- Ask what a board or a partner would need to see to approve it. A fixed scope with named deliverables answers that for a build; a monthly figure with the cadence and the deliverables written next to it answers it for a stay.
Then book the 30-minute call. You walk us through your locations and the list; we tell you which shape fits, what the first 30 days would look like, and what the quote will be based on. If neither shape is right for you, we say so on the call.
Frequently asked questions
Can we start with build and hand off and extend it?
Yes. Day 90 is a decision point in both shapes. If the scorecard says the boards need an operator for another quarter, we stay month to month. If your team owns it, we hand off and leave.
Is build and stay the same as a fractional COO?
It is the operating team version of it. You get the senior on strategy and the operator inside your boards, on a monthly basis, running the weekly cadence with your office managers. It feels like a full-time role from inside the offices because the cadence is weekly; the cost is sized to the hours the boards need.
What happens on the call before we get a quote?
You describe your locations, who runs what today, and the one to three initiatives you need to land. We tell you which shape fits and why, what the first 30 days would look like, and what the quote will be based on. You get the number after that conversation, in writing.
Our PE partner wants to see this as a capital project. Is that possible?
For PE-backed groups looking at add-backs, a build with a defined scope and named deliverables can be structured as a capital expense. Bring your timeline to the call.
We already have a director of operations. Which shape is that?
Usually build and hand off, with your director as the person who owns day 91. The build gives them the boards, the scorecard and the weekly meeting already running; we hand them the keys instead of a binder.
Where the proof on this page comes from
Every number and named process above traces to a row in our proof library. Each row names its source and the date we last checked it.
- P-042 The two engagement shapes offered on discovery calls: a one-time build with a hand-off, or build and stay month to month with the same two people.
- P-005 Two people on every client: one senior on strategy and the relationship, one operator inside your boards every day.
- P-006 A named deliverable at day 30, 60 and 90.
- P-007 The 90-day engagement runs in four phases: days 1 to 14, 15 to 30, 31 to 60, 61 to 90.
- P-012 Client work runs on a shared board with owners and due dates (the Command Board), reviewed weekly.
- P-044 Rollout rule Craig gives on calls: finish the technical setup of a system of action inside about 30 days, then track training, adoption and the agreed success measures.
- P-045 For PE-backed groups looking at add-backs, the engagement can be structured as a capital expense.
- P-046 Scope control on every engagement: one initiative at a time, KPIs defined before the work starts, change orders for anything outside scope, an internal hand-off with the proof pack at the end.
- P-023 A six-location dental group converting from Dentrix to Denticon office by office: three offices live, the next go-live scheduled, two-office same-day conversions, carrier mapping and a data audit before each one.
- P-010 ASC runs the weekly office managers meeting (an L10) at a four-office dental group: scorecard, to-dos, issues, with Craig and the ASC operator in the room.
- P-026 A four-office dental group where ASC runs the leadership L10, the office managers L10, the revenue cycle function and the AI phone agent rollout.
- P-041 The 30-minute call: no pitch deck; by the end of it you know whether ASC is the right fit and what we would do first.